Hippo is at the forefront of the power plant equipment supply industry. Our mission is to provide high-quality, innovative machinery that meets the needs of modern demolition and construction projects. We specialize in robot mini-diggers, designed for emission-free work, and are committed to adhering to all safety standards.

Demolition of buildings is carried out for a variety of reasons. It can be an emergency condition of the structure, obsolescence and physical obsolescence of the building or due to the requirement of an urban plan. During demolition, the building structures, components and parts that have fallen into disrepair are removed to create conditions for subsequent installation work (if any is planned). During the dismantling process, occupational health and safety must be ensured

 

In the case of the major renovation of a building, dismantling can be carried out in two ways. The first involves the complete replacement of the roof structures, floors and internal landscaping. In the second, the roof is left intact and the ceilings and amenities are partially dismantled. In both cases, the work is carried out from the top downwards. Full demolition requires a higher lifting capacity than partial demolition.

Demolition of buildings and other building structures is carried out using different methods. Their choice depends on such factors as the age of the object, its size, type of foundation, design features, materials used and other parameters.
Demolition of buildings is carried out by the following methods:

  • Manual. This is the most time-consuming method of dismantling, as it involves the disassembly of the structure manually using tools and simple devices. Manual dismantling is used when a small amount of work is required and when it is not profitable or site conditions do not allow the use of machines.
  • Semi-mechanical. A frequently used method of demolition uses pneumatic and electric tools. Resort to this method when planning partial dismantling of structures, when the work takes place in cramped conditions.

Demolition is carried out in several stages. First, it is necessary to prepare the object for demolition, create a plan of work, determine the timing of the demolition, and ensure the safety of technological activities by installing special signs, creating auxiliary sites and fencing the working area. At this stage, the site is disconnected from utilities, and electrical wiring and utilities are removed from the premises. Also, keep in mind the need to obtain permits from the city authorities.


The best way to complete demolition quickly is to purchase our demolition robot mini excavators Our products cover all the steps and nuances of this task. If you would like to ask a question of our experts, please contact us

 

 

 

 

Get in Touch

Ready to Elevate Your Demolition Projects?

Contact us today to learn more about our equipment and how we can assist you in achieving your project goals in a sustainable manner.

©Copyright. All rights reserved.

We need your consent to load the translations

We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.